Sunday Summary: October 19

The train is done! And Rudolph is the driver!

There is a bit of progress on the quilt … Week 1 – 4 are done. Week 5 is in progress! For Week 6, I need to make 96 small flying geese. Below is the current progress showing some of Week 5. You can access the Mystery HERE. No further progress …

Kate, from Life in Pieces, is hosting “Stitching Stuff” and the goal is to sew for at least 15 minutes a day. I use Kate’s guideline, but my personal goal is to sew for 30 minutes a day. On those “blah” days, it does motivate me to sit at my machine and 30 minutes often turns into several hours. Thank you Kate for the motivation!

  • January – September: 262 / 272 days
  • Oct: 19 / 19 days
  • Total: 281 / 291 96%

Design Wall Mondays

Judy, at Small Quilts and Doll Quilts, hosts a linky party for “What’s on your Design Wall” every week.

Piecing projects:

  • Laundry Basket Mystery: Weeks 5, 6 & 7
  • Piecing scraps of Splish Splash (see here) for something.
  • Starting Island Batik November Challenge
  • Work on a Test quilt for Songbird Designs

Quilting projects: none

So far, I’m doing good!! My picture shows an orange petal each day that I clean for 15 minutes and the rest of the time is spent sewing … (the petals do not represent the exact time … but when I clean, I set my timer for 15 minutes and I stop when it goes off! [Leanne of Devoted Quilter has a fun way to track your progress. This is for October and November. You can download a form to colour in each day as you work your way through. You can go to Instagram and click on her post HERE ]

Donna at Quilt Paint Create hosts a weekly linky party where you can display your stash numbers. This has really kept my stash from growing (somewhat!) Before I buy anything, I am always mindful of the fact that I need to report it on my blog … That sometimes stops me in my tracks!

The byAnnie bag used a total of 3 yards!

  • Fabric used in the last week: 2.5 yards
  • Fabric Used in 2025:     201 yards. {67 yards of non Island Batik fabric}
  • Fabric Added in the last week: 0 yards
  • Fabric Added this year:    28.5 yards 
  • Net Fabric used:              167.5 yards

Carol from Quilt Schmilt is hosting “To Do” every week.

To Do from the a few weeks ago:

  1. Laundry Basket Mystery: Weeks 5, 6 & 7. XX not done XX
  2. Christmas Train: need to finish borders and “driver”, sandwich and quilt. √   DONE
  3. Piecing scraps of Splish Splash (see here) for something. in progress
  4. Starting Island Batik November Challenge in progress
  5. Work on a Test quilt for Songbird Designs in progress
  6. Do NOT be distracted by any SQUIRRELS! I NEED this continual reminder! √   DONE.
  7. Tidy & clean studio for 30 minutes. √   DONE. 

To Do for this week:

  1. Laundry Basket Mystery: Weeks 5, 6 & 7.
  2. Piecing scraps of Splish Splash (see here) for something.
  3. Continue working on Island Batik November Challenge
  4. Continue to work on a Test quilt for Songbird Designs
  5. Do NOT be distracted by any SQUIRRELS! I NEED this continual reminder! 
  6. Tidy & clean studio for 30 minutes.

Don’t Forget

I am now a Silly Moon affiliate! So what does that mean? When you use my affiliate code Quiltinggail2024 at Silly Moon, you will receive 10% off your order and I will receive a small commission.

One who sleeps under a quilt is covered by LOVE!

Linking to:  

16 thoughts on “Sunday Summary: October 19

  1. Hi Gail. I’m trying again to comment on this post. I’m in love with your perfect engineer; Rudolph. He finishes the Christmas Train perfectly. Thanks for sharing on To Do Tuesday. 😉 Carol

    Like

  2. Your Christmas train is really cute and so is the driver! You’ve had a good year on the stitching front. Hard to believe we’ve just got a little over 2 months left in the year.

    Like

  3. You are a bit ahead of me with the Laundry Basket quilt – it’s looking great! I will have time to hopefully catch up at a quilt retreat in early November.

    Like

Comments are closed.