One Gift a Month
This month’s gift is Soup Bowl Cozies. You can go to Days Filled With Joy for information and links to several different on-line tutorials.
So far for the One Gift a Month, I have made January’s, February’s, and April’s gifts.
I need to pick out my fabric for my Soup Bowl Cozies … and to find some 100% cotton batting. Cotton fabric and cotton thread (Aurifil) I have.
Stitching Stuff
Kate, from Life in Pieces, is hosting “Stitching Stuff” and the goal is to sew for at least 15 minutes a day. I use Kate’s guideline, but my personal goal is to sew for 30 minutes a day. On those “blah” days, it does motivate me to sit at my machine and 30 minutes often turns into several hours. Thank you Kate for the motivation!
- January – April: 117 /120
- May: 28/ 28
- Total: 145 / 148
- Percentage: 98%
Stash Report
Donna at Quilt Paint Create hosts a weekly linky party where you can display your stash numbers. This has really kept my stash from growing (somewhat!) Before I buy anything, I am always mindful of the fact that I need to report it on my blog … That sometimes stops me in my tracks!
The past week’s finishes is this blue & green Hugs and Kisses quilt. It used 6.5 yards. You can read more about this quilt HERE.
Yearly Tally:
- Fabric Used the last week: 6.5 yards
- Fabric Used in 2023: 107.5 yards from non-IB: 46.5
- Fabric Bought this week: 0 yards
- Fabric Added this year: 12.5 yards
- Net Fabric used: 95 yards
Just an FYI: I do not count any fabric that is given to me (Island Batik), but this year, I am going to count it as fabric used.
To Do Tuesday
Carol from Quilt Schmilt is hosting “To Do” every week.
My To Do list from last week:
- Finish Mystery Quilt (making and writing). Partially done. I have someone who agreed to test it – so I need to get the pattern to her soon! And, I am starting to quilt it!
- Finish June IB challenge √ DONE just need to finish writing the blog post and I’ll be posting in June, sometime.
- X’s & O’s #1 & #2: bind Partially done. #1 was bound and I blogged about it on Friday see HERE. #2 still needs binding! The binding is cut and ready to go on …
- Do NOT be distracted by any SQUIRRELS! I NEED this continual reminder! √ DONE
- Tidy & clean studio for 30 minutes. √ DONE I actually spent over an hour vacuuming and tidying … but I’m thinking that perhaps I need to spend more time each day!
This week’s list:
- Finish Mystery Quilt (making and writing).
- Finish “When Pigs Fly” project
- Finish the Secret Project for Kelly Young’s new book – I’ll be telling you all about it in June!
- Lone Star Left-overs – get it to a flimsy stage.
- Do NOT be distracted by any SQUIRRELS! I NEED this continual reminder!
- Tidy & clean studio for 30 minutes.
Design Wall
Judy, at Small Quilts and Doll Quilts, hosts a linky party for “What’s on your Design Wall” every week.
Piecing projects:
- Secret Project for Kelly Young’s new book (mostly the purples and greens from the Island Batik Napa Valley collection – 1st picture)
- Using Left-overs from a Lone Star that I made earlier this year. (Blocks being made from the left-overs)
- Project for When Pigs Fly
Quilting: These are sandwiched and ready to quilt …
- Nutcracker
- Bird Panel
Upcoming Blog Hops
Moose Stash Quilting: Sew It – Show It: When Pigs Fly (My day is June 19)
Just Let Me Quilt: Sew It – Show It: Picnic Party. (My day is July 20)
Moose Stash Quilting: Sew It – Show It: Call Me Crazy
One who sleeps under a quilt is covered by LOVE!
Happy Quilting!
Gail
Linking to:
- So Scrappy @ Scrap Happy
- Sunday Stash @ quiltpaintcreate
- Oh Scrap @ Quilting is More Fun than Housework
- Frédérique @ Quilting Patchwork Applique
- 15 Minutes to Stitch @ Life in Pieces
- Sew and Tell @ Melva Loves Scraps
- Design Wall Monday @ Small Quilts and Doll Quilts
- Monday Musing @ Songbird Designs
- To Do Tuesday @ Quilt Schmitt